controlled optimization of trnsys simulation (MathWorks Inc)
Structured Review

Controlled Optimization Of Trnsys Simulation, supplied by MathWorks Inc, used in various techniques. Bioz Stars score: 90/100, based on 1 PubMed citations. ZERO BIAS - scores, article reviews, protocol conditions and more
https://www.bioz.com/product/controlled+optimization+of+trnsys+simulation/pmc05544020-208-31-27
Average 90 stars, based on 1 article reviews
Images
1) Product Images from "Determination of Vertical Borehole and Geological Formation Properties using the Crossed Contour Method"
Article Title: Determination of Vertical Borehole and Geological Formation Properties using the Crossed Contour Method
Journal: Geothermics
doi: 10.1016/j.geothermics.2016.12.007
Figure Legend Snippet: Summary of Estimated Ground Properties
Techniques Used:
Figure Legend Snippet: RMS Borehole Exit Temperature Error for Each Parameter Prediction Method
Techniques Used:
Related Articles
Comparison:Article Title: Determination of Vertical Borehole and Geological Formation Properties using the Crossed Contour Method Article Snippet: .. Several other parameter estimation methods were also used to provide a basis of comparison; these are based on the LSM, the Oak Ridge GPM tool, and a |